The water utility in Lyons stopped working in September 2013. The flood that week blocked every access route to the town, damaged the wastewater plant's influent pumping, final disinfection and piping, and left the water system inoperable, and a repair and enhancement plan followed. Municipal buildings are not only offices and libraries; many are the infrastructure that a town cannot function without, and the best time to think about resilience is before the first drawing.
We build for towns, cities and counties in the Boulder Valley: fire and police stations, public works yards, recreation and community centers, libraries, water and wastewater buildings, and the occasional airport building. The owner is a public body, and that changes procurement, communication and accountability. A council or board approves the budget in a public meeting, residents have a stake in the site, and every dollar is tracked. We plan to those conditions as part of the job.
Working in public
A municipal project has more audiences than a private one. Staff, elected officials, neighbors and the press each want different information, and each is entitled to it. We prepare cost and schedule reports that a council member can read, and we keep a plain record of decisions, changes and their reasons. Open communication costs little and builds the trust a long project needs.
Delivery method is usually set by the owner's procurement rules. Some towns use competitive bidding on completed drawings, while others use construction manager at risk or design-build for complex work. We have views on when each fits, which we share during early meetings, and we work comfortably in all of them. For a project where the owner is still deciding, our construction manager at risk approach lets us bring pricing into design while keeping competitive bidding at the subcontractor level.
What public owners here are dealing with
Several towns in the metro are living with the aftermath of disasters. The September 2013 floods destroyed 262 homes in Boulder County and damaged nearly 300 more, and in Jamestown the town lost 20 percent of its homes and 50 percent of its roads. The Marshall Fire of December 2021 destroyed an estimated 1,084 structures. These events shape what public owners ask for: buildings sited out of harm's way, redundancy in utilities, and recovery plans that residents can rely on.
Growth shapes demand too. Erie grew from about 18,135 residents in 2010 to 30,038 at the 2020 census, with a 2025 estimate of 40,904, which means new facilities for a town that has more than doubled in a generation. Longmont is a different case. The City of Longmont is the second-largest employer on its own list with 1,625 employees, and it approved NextLight, a municipal gigabit fiber network, in May 2013 to reach every house and business over three years. We follow how each town funds and sequences its capital work, since the funding source often decides the schedule. For a wider view of how we work with public bodies, see government and public sector clients.
Public budgets and the contingencies that protect them
Public projects are usually funded from a fixed source: a bond, a sales tax, a grant or a utility fund. The budget is set before design is far along, and changing it can require another vote. That makes early cost control essential. We prepare estimates at each design milestone, report variances in plain terms, and propose options before the design is too far to change.
Contingencies are held and spent openly. We establish an owner contingency and a design contingency at the start, define who can release funds and report their use with every pay application. Allowances for unknowns, such as soils conditions, existing utilities and hazardous materials in older buildings, are identified and sized, not buried. Where a public building replaces an older one, demolition and abatement are priced as their own scope, so the board sees what it is paying for.
Schedules that survive public process
Approval steps are part of the schedule. A council vote, a planning commission hearing, a referral to neighboring jurisdictions and a floodplain review each have their own timelines, and the building permit sits behind them. We build those steps into the schedule and flag the ones that cannot overlap. A fire station that serves a growing area cannot wait for an unplanned redesign, so we raise early any assumption that could trigger one.
Construction schedules for civic buildings also account for the service they provide. A recreation center closes for a season; a fire station may need to stay in service in a temporary location; a water or wastewater building must keep the utility running. We plan temporary arrangements with the owner, and we write them into the contract documents, not into hallway promises.
Buildings for civic uses we work around
Municipal owners bring many building types to us. Civic offices follow the same energy and code rules as other commercial buildings, and our office building planning applies. Library and recreation projects share design questions with schools, so owners often compare notes with our school and campus work. Airports are a special case in this metro, since Longmont owns Vance Brand Airport, whose single concrete runway measures 4,800 by 75 feet, and Erie and Boulder also own airports.
When a town owns an airport, hangar and terminal projects, utility extensions and incentive discussions with tenants all pass through the same council. The City of Longmont has said it is willing to work with tenants on development incentives for its airport land. We treat that as an opportunity to ask early, before a site plan commits to an access road or a utility corridor that the city may prefer elsewhere. For more on how we approach these projects, see our municipal government construction page.
Bring us the capital plan
Send the bond language or funding source, the site and the dates that matter to your council. We will return a delivery recommendation, a budget outline and a schedule that includes each public approval.
Questions Owners Ask
Which delivery methods do Boulder-area towns use?
It varies by owner and project. Some use competitive bidding on completed drawings, others use construction manager at risk or design-build for more complex work. We work in each, and we explain the trade-offs on cost certainty, speed and owner control.
How do you keep a town informed during construction?
We provide regular reports on cost, schedule and change orders that a non-technical reader can follow, we attend council or board meetings on request, and we keep a public-facing look-ahead for neighbors. Plain records also make later audits straightforward.
What does flood resilience mean for a municipal building?
It starts with siting. In the City of Boulder, buildings in the 100-year floodplain need a Floodplain Development Permit, and county rules take priority where they conflict with building code. Beyond siting, it means elevating mechanical and electrical equipment, using flood-tolerant materials and keeping critical functions operational.
Can you work in a town that is still on an older code edition?
Yes. Editions differ, and the tracker we reviewed shows Superior on the 2018 International Building Code, Lafayette and Longmont on 2021 and Boulder on 2024. We design to the edition the town enforces, and we confirm any pending adoption in writing.
How are airport projects handled when a city owns the land?
The city is both landlord and permitting authority, so we coordinate a lease or development agreement, utility approvals and building permits in parallel. Longmont has said it is willing to discuss incentives for airport tenants. We recommend raising those questions before design is complete.
Related
Related Services
Related Building Types
Ready to talk about your project?
Request a Project ReviewMore Building Types
Building Types
Browse the rest of our building types pages for Boulder and nearby Colorado communities, or contact us to talk through your project.