School construction runs on the academic calendar, and that calendar is not negotiable. A classroom wing that is two weeks late in August is not two weeks late; it is a semester of temporary arrangements, portable classrooms and frustrated families. Everything we do on an education project is organized around handing the building over before students and faculty need it, which in practice means working backward from the first day of classes through the long-lead items, the weather and the inspections.

We build K-12 schools and additions, higher education buildings, labs and classrooms, student centers, athletic facilities, and early learning centers, as well as residence halls through our student housing work. The owners are school districts, universities, charter operators and private institutions, each with its own procurement rules, approval bodies and standards. Public owners may need competitive bidding or specific delivery methods, and we have the process to fit those requirements.

The Boulder Valley has its own expectations of educational buildings. Campuses invest in energy performance and durability, communities pay close attention to design, and much of the work happens on sites that are already full of people. We approach each project as a coordination task as much as a construction one.

Campuses and School Districts in the Valley

The University of Colorado Boulder main campus covers 786 acres, with East Campus about a quarter mile away and Williams Village about 1.5 miles from the main campus. That spread means campus construction involves moving materials across a working campus, coordinating with a university facilities group and working inside an architectural identity: the campus buildings follow Charles Klauder's Tuscan Vernacular Revival style, using sandstone from Front Range quarries with red-orange tile roofs. New work near the CU Boulder campus must fit in with that material palette or make a deliberate and approved departure.

Public school districts are among the largest employers in their cities. Boulder Valley School District reported 3,832 employees in the city's 2022 annual financial report, and a 2020 report summarized for Longmont lists St. Vrain Valley Schools at 3,543. Those figures are a reminder of how much public construction depends on the school calendar and on the budgets districts adopt.

Working Around Students and Staff

Many education projects are built next to occupied classrooms, and the safety plan has to match. We separate the construction site from the school with fencing, dedicated gates and a clear traffic plan for deliveries, so trucks and children are never in the same place at the same time. Background checks and badge systems control who enters the campus, and workers receive a short briefing on conduct around students.

Noise and dust get managed as well. Loud demolition, concrete saws and pile work are scheduled outside testing periods and, wherever possible, outside class hours. Where the project connects to existing mechanical or fire systems, shutdowns are planned with the facilities director so classrooms keep heat and alarms. These practices parallel what we do on any renovation project in an occupied building, and they are not new to us.

Summer Windows and Phased Handover

The summer break is the schedule for most renovation work. A district may have eight to ten weeks to gut a wing, install new systems and be ready for inspection, so there is little room for error. We plan these projects months ahead: submittals are approved, materials are on order and stored, and subcontractors are committed before the last day of class. A single delay in switchgear or roof material can ripple through the summer, so we track long-lead items from the day of award.

New buildings can be phased so that classrooms are delivered first, with gymnasiums, cafeterias and site work following. We coordinate with the building department for partial occupancy when it makes sense, and we prepare closeout documents, training sessions and warranty information so the district's facilities staff can take over smoothly. Our commissioning and closeout process covers those handoffs, and the school and campus building type is the one we most often deliver in this way.

Classrooms, Labs and Parking Below Grade

The range of educational scopes is broad. A classroom addition is mostly framing, envelope and finishes. A science building is closer to a laboratory, with fume hoods, specialty gases, vibration control and high air-change rates. A student center combines dining, assembly and office space. An athletic facility involves long spans and large mechanical systems. Each has a different mix of trades and a different cost per square foot.

Campus projects also touch the ground in complicated ways. The 323,000 square foot Center for Community at CU Boulder opened in September 2010 at a cost of $84.4 million, with a 140,000 square foot underground parking structure. That combination of dense program above and structured parking below is a good example of what campus building requires: deep excavation, shoring, waterproofing and careful sequencing so classes continue overhead.

Review Bodies and Energy Expectations

Education projects pass through more than the building department. In Longmont and other towns, public schools may answer to a state review for certain life safety and accessibility items, a district's own design standards, and a school board. Universities have their own facilities review and design committees. Each reviewer has a timeline, and we map them with the owner before design completes.

Energy performance often matters more to education owners than to private developers, since they keep buildings for a long time and pay the operating costs. In Boulder, commercial projects follow the 2024 City of Boulder Energy Conservation Code, and elsewhere in the valley the governing edition depends on the town. We price the mechanical systems that meet those standards and show the long-term savings of higher-performing options. For public owners comparing delivery methods, we explain how construction manager at risk delivery can support early cost control.

Tell Us the Opening Term

Share the program, the site and the semester you need to open. We will return a schedule built backward from that date and a preliminary budget.

Questions Owners Ask

When should an education project begin so it opens on time?

A new school building should begin construction at least a year or more before the target opening, with preconstruction well before that. Renovations scheduled for summer should have permits, submittals and material orders complete before the term ends. We build the plan backward from the first day of class.

How do you keep students safe on an active campus?

We separate the work area with fencing and gates, route deliveries away from student paths, control access with badges and background checks where required, and schedule loud or hazardous operations for times when students are not present. The plan is written and shared with the school before work starts.

Can a university project continue while the campus stays open?

Yes. Campus construction is typically staged around classes, events and traffic, and we coordinate with the facilities group on utility outages, haul routes and noise. Underground work, like the garage beneath a large campus building, is planned with shoring and waterproofing so activity above can continue.

Do public school projects need competitive bidding?

That depends on the owner's procurement rules. Some districts bid projects competitively, while others use construction manager at risk or design-build where state law and their policies allow. We can work within the method the owner selects and help evaluate the tradeoffs.

What makes laboratory and science buildings more expensive?

Fume hoods, specialty gas, exhaust, vibration control and higher air-change rates drive mechanical and electrical costs. Casework and finishes are also more specialized. We price these systems separately so owners see their effect on the budget.

Related

Ready to talk about your project?

Request a Project Review

CATEGORY

AREA

Boulder County

NEXT STEP

More General Contracting Services

General Contracting Services

Browse the rest of our general contracting services pages for Boulder and nearby Colorado communities, or contact us to talk through your project.

ServicesBuilding TypesIndustriesService AreasAboutContactRequest a Project Review720-513-2464
Call720-513-2464