Six bus bays and a 386 space parking structure opened at RTD's Boulder Junction station in August 2015, with 75 of those spaces reserved for transit riders. The number is a good reminder that parking in this metro is a planned system tied to transit, retail, employers and housing, not a leftover. A surface lot is the part of the system most owners can change themselves, and the way it is built decides whether it needs repair in five years or twenty.

We build new surface lots, reconstruct failed ones and mill and overlay good ones. The scope includes subgrade, base, asphalt or concrete paving, curbs and gutters, accessible routes and ramps, drainage, striping, signs and lighting bases. We prefer to start with a look at how the lot is used, including what the drainage system has to carry, because a lot that handles delivery trucks and a lot that only handles cars are different pavements.

Owners who ask us for this work are developers delivering a shopping center or office park, retail chains refreshing a location, and property managers with a lot that has begun to pond water, crack and heave.

From subgrade to striping

Good paving starts at the subgrade. We strip the lot, proof roll it and correct soft areas before any base is placed, because asphalt on a soft subgrade fails from the bottom up. Aggregate base is placed in lifts and compacted to the specified density, with grades checked against the civil plan at close intervals. Asphalt is placed at the thickness the section calls for, compacted in the temperature window that allows it and checked for smoothness.

Concrete curbs, gutters, ramps and sidewalks are formed and poured next to the pavement. We set accessible parking and routes with slopes within allowable limits, which means measuring cross slope and running slope at each ramp and stall, and not just trusting the form. Striping, wheel stops, signs and bollards close out the scope, and we check against the approved layout before the lot reopens.

Paving seasons and occupied lots

Asphalt needs warm ground and air to compact properly, and Boulder-area paving seasons are shorter than owners expect. Cold mornings and late fall make timing a real constraint. We plan the paving date around the weather window, order material early and hold alternate dates when the forecast is uncertain. Concrete work is less temperature-sensitive but still needs protection during a hard cold snap.

Occupied lots complicate everything. We phase the work so tenants and customers always have access to some stalls, sign detours and move deliveries away from the work zone. For retail sites, we often work at night or on a weekend, in coordination with the property manager and the tenants. A short, well-communicated closure usually costs less than a long, partial one.

Highways, interchanges and how lots are used

Drivers reach many Boulder County lots from the U.S. 36 corridor, where the first express lane phase cost $497 million, and from interchanges like the State Highway 170 diverging diamond serving Superior and Louisville that opened in October 2015. Those corridors fill the lots near them with commuters who use park-and-ride, retail and office parking in the same day, so lot capacity and circulation matter as much as pavement strength.

At the Niwot Park-n-Ride, the CO 119 safety and bikeway project is adding bus rapid transit platforms at an enlarged facility that was scheduled to reopen in May 2027, though a report more than a year old suggests the schedule may have shifted. We take that as a reminder that parking lots near transit change with the transit plan. Before we rebuild a lot, we ask the owner and the jurisdiction whether road, transit or redevelopment plans will change access to it.

What drives parking lot cost

Area and section thickness give the starting number. Subgrade condition, haul distances, drainage structures, curb and gutter length and accessible ramp counts adjust it. Reconstruction costs more than overlay, but an overlay on a failed base only hides the problem for a season. We tell owners which method fits the condition and why.

On sites where the grade must change before paving, we bring in the mass grading crew first so the pavement starts on a stable, correctly shaped surface. The tradeoff between concrete and asphalt, and between full-depth reconstruction and milling and overlay, is a cost over time question, not a first cost question. We show lifecycle numbers when the owner asks, including crack sealing and sealcoat schedules. We also flag snow storage and drainage, because a lot with nowhere to put plowed snow and no way to drain meltwater will cost the owner every winter.

Where we pave and repair

We work throughout the Boulder Valley, including Boulder Junction, Longmont, Lafayette, Louisville, Erie and Superior. Each town has its own review and design standards, from landscape islands to stall dimensions to stormwater treatment, and we check them before we draw the layout.

For lots that connect to parking decks or large buildings, we also coordinate with parking structure designers so the grade at the deck entrance, the stall counts and the traffic flow agree. Lots near truck docks borrow from truck court design where heavy vehicles share the pavement.

Walk the lot with us

Send us the site plan or invite us to walk the lot, and we will recommend repair, overlay or reconstruction and give you a schedule that fits your tenants.

Questions Owners Ask

Should we overlay or reconstruct the lot?

Overlay works when the base is sound and the pavement problems are limited to the surface. If the lot has widespread alligator cracking, heaving or ponding, the base is probably failing and an overlay will not last. We take cores and probe the base, then recommend the option that fits the condition and budget.

When is the paving season?

Asphalt compacts properly only above certain ground and air temperatures, so spring through early fall is the usual window. Cold mornings, rain and wind can shorten it, and we plan alternate dates. Concrete work can continue later in the year with cold weather protection.

How do we handle accessibility requirements?

We follow the accessible parking and route requirements in the approved plans, measure slopes at each ramp and stall and correct anything outside tolerance before the lot opens. It is far cheaper to adjust a form than to saw out a finished ramp, so we check before the pour.

Can the lot stay open during construction?

Usually part of it can. We phase the work by section, keep walkways clear and use signs and flaggers. For retail and office sites we schedule noisy or disruptive work for nights or weekends where permitted. The plan is shared with tenants before we start.

How do we plan for snow?

Snow storage areas should be designated on the plan, away from drains, fire lanes and accessible routes, and positioned so meltwater drains toward collection points rather than across drive aisles. We review that layout during design and adjust grading if the existing plan sends water to the wrong place.

Related

Ready to talk about your project?

Request a Project Review

CATEGORY

AREA

Boulder County

NEXT STEP

More General Contracting Services

General Contracting Services

Browse the rest of our general contracting services pages for Boulder and nearby Colorado communities, or contact us to talk through your project.

ServicesBuilding TypesIndustriesService AreasAboutContactRequest a Project Review720-513-2464
Call720-513-2464